Option,Description,Upfront Cost (Est.),Service Life (Years),Lifecycle Cost (25-Year),Risk Profile Minimal Patch,Spot repairs on the bridge deck and structural components to address immediate safety concerns and extend life short-term.,125000,4,1875000,High Major Rehabilitation,"Comprehensive repair of all deteriorated elements, including deck resurfacing, joint replacement, and steel member strengthening.",950000,22,1250000,Low Full Replacement,Demolition of the existing structure and construction of a new bridge designed to modern engineering standards for long-term service.,2500000,75,2550000,Very Low